Sorry, we don't support your browser.  Install a modern browser
This post is closed.

Statistics Page#1327

?

Add the old Shapez 1 statistics page where it shows how much of each shape has been produced (in shapez 1 stored in the hub), how much is being produced, and how much is being delivered.

2 years ago
3
Merged Units per second#1308
2 years ago

Love this, thumbsed up it. Could we also have the option to toggle timeframes. I prefer units/minute, especially with trains only being every so often.

2 years ago
2
Changed the status to
Planned
2 years ago
Merged Stats for items/min#848
2 years ago

Get statistics directly from the conveyors, so you know how many shapez transit per minute on a conveyor line. I think it would be great for optimization freaks like me!

2 years ago
1

Yes Yes Yes

2 years ago
Merged Vortex shapes per min#2000
2 years ago

This is a good idea, but I have one thing against it, being that if you deliver a wrong shape for example, it will stay there forever, bothering you endlessly.

2 years ago
1

@Marluna There should be a trash for unwonted shapez or whatever.

2 years ago
?

There is a mechanic for unwanted shapez. I forget what its called but it’s in the game, has been from day 1. Lake or pond “can be used for decoration”. Just read the descriptions of things.

2 years ago
Changed the status to
Completed
2 years ago
2

Coming with 0.0.9

2 years ago
4

Preview:

2 years ago
6

Second tab:

2 years ago
8

Very cool, thanks!

2 years ago

@FuzzyPig5623 I don’t mean to destroy shapes, but when you messed up in your manufacturing of a shape, and that shape doesn’t match the required shape, say a layer is rotated wrong, in shapes 1 it stays there.

2 years ago
?

For the delivery of shapes, I think the statistics only display shapes delivered using belts. I don’t believe it includs shapes delervered using trains that dive directly into the void. Now that I am end game, my statistics page is blank since I only use trains to deliver shapes into the void.

8 months ago
?

Any chance there can be stats of what’s produced not just delivered? i hate having to wait until shapes get delievered to understand my output of a new assembly line

5 months ago